Artistic impression sketch of Solent Gateway 2. This is indicative and based on our emerging proposals.

The proposed site

We are proposing to develop Solent Gateway 2 to the south of Solent Gateway (which used to be called Marchwood Military Port). This is on the opposite side of the River Test to the Port of Southampton.

This area is made up of land reclaimed between the 1930s and 1970s for the expansion of port activity and has long been held as a site for expansion of the port. It is now being brought forward through these emerging proposals for Solent Gateway 2, with less than half of this area proposed for the development of port infrastructure.

Below is an indicative outline plan of the proposed site. This plan shows the location of the proposed development in relation to the existing Solent Gateway, rail infrastructure, public rights of way and the National Park boundary. This plan also details the proposed lines of connectivity throughout the development, including potential foot and cycle paths and the link road. These routes would connect the proposed development to, and allow access from, the A326. This plan provides an overview of our emerging proposals, with each of the elements shown discussed in greater detail throughout this website.

This site has been chosen because:

  • The existing port estate has limited potential for expansion or further intensification.
  • There are no other sites in our local area which can accommodate this expansion.
  • It allows us to make best use of the existing Solent Gateway facility.
  • It presents the opportunity to provide areas set aside as enhanced and improved green space.
  • It enables us to offer greater capacity and support to the armed forces.
Indicative outline plan of the proposed site.
Indicative outline plan of the proposed site.

Recognising Marchwood is the Ministry of Defence’s (MOD) primary sea mounting centre, we will be able to offer the MOD increased capacity and resilience through the additional port space and berths, thereby increasing our ability to support MOD operations.

If land is required from third parties, either temporarily or permanently, we would endeavour to reach voluntary agreements with the relevant landowners. We will continue to contact any affected landowners as our proposals develop. If you have any queries regarding land ownership in relation to these proposals, please contact us.

Explore more